OSBORNE L

osborne l 2

Project Details

  • OSBRONE L
  • Foreshore Waters

Project Description

At Osborne L, AOJ delivered a full-scale electrical and plumbing installation, expertly managing every critical stage to ensure a safe, efficient, and reliable system for the development.

Our work began with the first fix piping, establishing a solid and compliant plumbing foundation essential for the building’s long-term functionality. We then proceeded with the installation of load cables to each apartment, guaranteeing a consistent and robust power supply throughout the complex.

We carried out the precise installation of electrical connections, integrating all necessary components to ensure seamless power distribution and operational reliability. The setup of gear switches and changeover systems followed, providing smooth power switching and backup capabilities to prevent downtime.

 

To enhance safety and comfort for residents, we installed common area lighting, illuminating shared spaces for better visibility and security. Additionally, fence lighting was implemented to secure the perimeter with effective lighting solutions.

Finally, we completed the project by installing lightning arresters, protecting the electrical infrastructure from potential surge damage caused by lightning strikes.

Throughout the Osborne L project, AOJ maintained the highest standards of quality, safety, and professionalism, delivering a dependable system tailored to meet both client needs and industry requirements.

What is Challenge for client?

Power Distribution Network

Ensuring safe and efficient delivery of load cables to multiple apartments.

First Fix Setup

Establishing a reliable first fix piping system to support the building’s plumbing needs.

Lighting & Security

Providing effective common area and perimeter lighting for safety and visibility

Providing Solutions From Start to The end

Initial Piping Installation: Established a strong and compliant first fix plumbing foundation.
Load Cable Installation: Supplied reliable power cables to all apartments for uninterrupted energy.
Connection Setup: Installed all necessary electrical connections ensuring smooth system integration.
Gear Switch & Changeover Installation: Provided seamless power switching and backup for continuous electricity supply.
Fence Lighting Installation: Secured the estate perimeter with effective lighting solutions.
Common Area Lighting Installation: Illuminated shared spaces to enhance safety and resident comfort.
Lightning Arrester Installation: Protected the electrical infrastructure from surge damage caused by lightning strikes.
Quality Assurance & Testing: Conducted rigorous inspections and tests to ensure safety, reliability, and full compliance.
ECOBANK

Categories

Cart
  • Your cart is empty Browse Shop
    Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
    • Image
    • SKU
    • Rating
    • Price
    • Stock
    • Availability
    • Add to cart
    • Description
    • Content
    • Weight
    • Dimensions
    • Additional information
    Click outside to hide the comparison bar
    Compare